Items where Division is "Fakultas Teknik > Teknik Industri" and Year is 2016

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Jump to: : | A | D | E | H | I | J | M | N | O | R | S | T | Y | Z
Number of items: 32.

:

: RIDLAN NURI, NIM : 08C10207005 (2016) ANALISIS NILAI OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN PENGISIAN TABUNG GAS ELPIJI 3 KG (Studi Kasus Di PT. Prima Cahaya Utama). Skripsi thesis, Universitas Teuku Umar Meulaboh.

A

AGUS BAIJAN, NIM : 09C10203054 (2016) ANALISA PRODUKTIVITAS ALAT BERAT DALAM PEKERJAAN PENGASPALAN (Studi Kasus : Proyek Peningkatan Jalan Gampong Cot – Lhok Bubon Kecamatan Samatiga Kabupaten Aceh Barat). Skripsi thesis, universitas teuku umar meulaboh.

ALI IBRAHIM, NIM: 09C10207029 (2016) PENGENDALIAN MUTU PADA PENGOLAHAN INTI KELAPA SAWIT DENGAN METODE STATISTIC QUALITY CONTROL (SQC) DI PT. KARYA TANAH SUBUR. Skripsi thesis, universitas teuku umar meulaboh.

ALI RIZO, 09C10203001 (2016) PENGARUH ADANYA MEDIAN JALAN TERHADAP TINGKAT PELAYANAN (STUDI KASUS : JALAN TEUKU UMAR MEULABOH). Skripsi thesis, universitas teuku umar meulaboh.

AULIANSYAH, 09C10203011 (2016) EVALUASI KINERJA JALAN SATU ARAH PADA RUAS JALAN SENTOSA MEULABOH DENGAN METODE MKJI 1997. Skripsi thesis, universitas teuku umar meulaboh.

D

DENI OKTAFIANSYAH, 09C10203063 (2016) ANALISA PRODUKTIVITAS ALAT BERAT PADA PEMBANGUNAN JALAN RAMBONG – PADANG SIALI (Studi Kasus : Proyek Pembangunan Jalan Rambong – Padang Siali Kecamatan Beutong Kabupaten Nagan Raya). Skripsi thesis, universitas teuku umar meulaboh.

E

EBA OKA, NIM : 09C10207035 (2016) PENENTUAN BEBAN KERJA FISIK DAN ASUPAN ENERGI OPERATOR PADA BAGIAN PEMBUATAN PAVING BLOCK DI UD. BATU ALAM KABUPATEN ACEH BARAT. Skripsi thesis, universitas teuku umar meulaboh.

H

HERWANTO, 09C10203067 (2016) IDENTIFIKASI MOTIVASI PEKERJA PADA PROYEK KONSTRUKSI DI KABUPATEN ACEH BARAT. Skripsi thesis, universitas teuku umar meulaboh.

I

IPA SUARDI, Nim : 09C10202005 (2016) PENGARUH TINGKAT CURAH HUJAN DAN KECEPATAN ANGIN TERHADAP KOROSI ATMOSFERIK. Skripsi thesis, universitas teuku umar meulaboh.

J

JUNIANTO PUTRA, NIM: 09C10207032 (2016) OPTIMISASI KINERJA MESIN PENGOLAHAN TANDAN BUAH SEGAR MENGGUNAKAN METODE RCCP (STUDI KASUS PT. KARYA TANAH SUBUR). Skripsi thesis, UNIVERSITAS TEUKU UMAR MEULABOH.

M

M A R B A W I, NIM : 09C10207005 (2016) ANALISIS KUALITAS PELAYANAN TERHADAP KEPUASAN PELANGGAN DI INDOMARET KECAMATAN MEUREUBO KABUPATEN ACEH BARAT. Skripsi thesis, Universitas Teuku Umar Meulaboh.

MARZUKY ARI TONANG, NIM: 09C10207013 (2016) ANALISIS USULAN PERBAIKAN MUTU PRODUK BERDASARKAN METODE SEVEN TOOLS DI UD.YAMAY PERABOT. Skripsi thesis, universitas teuku umar meulaboh.

MUNIZAR, NIM:09C10203062 (2016) ANALISIS KINERJA SIMPANG TAK BERSINYAL (studi Kasus : Simpang Tiga Gampong Tengoh Kecamatan Samatiga Kabupaten Aceh Barat). Skripsi thesis, UNIVERSITAS TEUKU UMAR MEULABOH.

MURSALIN, NIM : 09C10207017 (2016) ANALISIS KESEIMBANGAN LINTASAN PRODUKSI DENGAN MENGGUNAKAN METODE MOODIE YONG DI UD. INDAH MEUBEL. Skripsi thesis, universitas teuku umar meulaboh.

MURSALIN, NIM : 09C10207017 (2016) ANALISIS KESEIMBANGAN LINTASAN PRODUKSI DENGAN MENGGUNAKAN METODE MOODIE YONG DI UD. INDAH MEUBEL. Skripsi thesis, universitas teuku umar meulaboh.

MURSALIN, NIM : 09C10207017 (2016) ANALISIS KESEIMBANGAN LINTASAN PRODUKSI DENGAN MENGGUNAKAN METODE MOODIE YONG DI UD. INDAH MEUBEL. Skripsi thesis, Universitas Teuku Umar Meulaboh.

Muhammad Nasir, NIM :09C10203052 (2016) ALOKASI SUMBER DAYA TENAGA KERJA DENGAN RESOURCE LEVELING MENGGUNAKAN PROGRAM MICROSOFT PROJECT (Studi Kasus Proyek Pembangunan Unit Sarana Belajar TK Pembina Kabupaten, Kecamatan Johan Pahlawan Kabupaten Aceh Barat). Skripsi thesis, UNIVERSITAS TEUKU UMAR MEULABOH.

Muhammad Yasin, NIM :09C10203051 (2016) KAJIAN POTENSI TERJADINYA TUNTUTAN KONTRAKTOR PELAKSANA TERHADAP PENGGUNA JASA (OWNER) PADA PROYEK (Studi Kasus Proyek Pembangunan Unit Sarana Belajar TK Pembina Kabupaten, Kecamatan Johan Pahlawan Kabupaten Aceh Barat). Skripsi thesis, UNIVERSITAS TEUKU UMAR MEULABOH.

Mukhlish, Nim : 09C10202003 (2016) PENGUJIAN ALAT UJI TARIK KOMPOSIT. Skripsi thesis, universitas teuku umar meulaboh.

Muliyadi, NIM :09C10203008 (2016) PENJADWALAN ULANG PROYEK KONSTRUKSI DENGAN PRESEDEN DIAGRAM METHOD (PDM) (Studi Kasus Pembangunan Pembangunan Unit Sarana Belajar TK Pembina Kabupaten Kecamatan Johan Pahlawan Kabupaten Aceh Barat ). Skripsi thesis, UNIVERSITAS TEUKU UMAR MEULABOH.

N

NAMA : EBA OKA, NIM : 09C10207035 (2016) PENENTUAN BEBAN KERJA FISIK DAN ASUPAN ENERGI OPERATOR PADA BAGIAN PEMBUATAN PAVING BLOCK DI UD. BATU ALAM KABUPATEN ACEH BARAT. Skripsi thesis, Universitas Teuku Umar Meulaboh.

NILA REKA, NIM : 09C10203078 (2016) PENJADWALAN DAN OPTIMALISASI BIAYA PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) (Studi Kasus Proyek Pembangunan Gedung Workshop Serba Guna Kecamatan Kuala Pesisir Kabupaten Nagan Raya). Skripsi thesis, universitas teuku umar meulaboh.

O

OEJI AULIADI, NIM : 09C10207034 (2016) PERANCANGAN MEJA KERJA YANG ERGONOMIS DENGAN MENGGUNAKAN METODE QUALITY FUNCTION DEPLOYMENT (QFD) PADA USAHA KECIL PENGELASAN. Skripsi thesis, UNIVERSITAS TEUKU UMAR MEULABOH.

R

RAHMA BONI ROSADI, NIM : 08C10207025 (2016) ANALISIS UTILISASI KAPASITAS PRODUKSI CPO DENGAN METODE THEORY OF CONSTRAINTS (TOC) DI PT. FAJAR BAIZURY AND BROTHERS. Skripsi thesis, Universitas Teuku Umar Meulaboh.

REZA HARISDA, 90C10203002 (2016) ANALISIS KINERJA PERSIMPANGAN TAK BERINISIYAL (STUDI KASUS: SIMPANG SISINGAMARAJA DENGAN JALAN PURNAMA DAN JALAN SENTOSA-MEULABOH. Skripsi thesis, universitas teuku umar meulaboh.

S

S U T R I S N O, NIM:09C10203047 (2016) ANALISIS PENJADWALAN TENAGA KERJA (Studi Kasus Pembangunan Gedung Poli, Administrasi (ADM), Kesehatan Ibu dan Anak (KIA) dan Ruang Bersalin di Desa Padang Panyang Kecamatan Kuala Pesisir Kabupaten Nagan Raya). Skripsi thesis, UNIVERSITAS TEUKU UMAR MEULABOH.

SITI HAJAR, 09C10207031 (2016) PERENCANAAN PENGENALIAN KUALITAS BATU BATA DENGAN MENGGUNAKAN METODE SIX SIGMA PADA UD. BATU BATA PREES DI NAGAN RAYA. Skripsi thesis, UNIVERSITAS TEUKU UMAR MEULABOH.

T

T A R D I, NIM: 09C10207003 (2016) PENENTUAN JUMLAH TENAGA KERJA BERDASARKAN ANALISIS BEBAN KERJA DENGAN METODE SWAT (SUBJECTIVE WORKLOAD ASSESSMENT TECHNIQUE) DAN WORK LOAD ANALYSIS DI UD. BATU BATA PRESS DUA SETANGKE KABUPATEN NAGAN RAYA. Skripsi thesis, universitas teuku umar meulaboh.

T A R D I, NIM : 09C10207003 (2016) PENENTUAN JUMLAH TENAGA KERJA BERDASARKAN ANALISIS BEBAN KERJA DENGAN METODE SWAT (SUBJECTIVE WORKLOAD ASSESSMENT TECHNIQUE) DAN WORK LOAD ANALYSIS DI UD. BATU BATA PRESS DUA SETANGKE KABUPATEN NAGAN RAYA. Skripsi thesis, Universitas Teuku Umar Meulaboh.

T.ROMI MAULANA, 09C10203019 (2016) SINKRONISASI RAMBU DAN MARKA DENGAN GEOMETRIK JALA PADA JALAN LUAR KOTA (STUDI KASUS:BANDA ACEH-MEULABOH PADA STA 27+150-27+550,STAA 30+750-31+150 DAN STA 42+450-42+650). Skripsi thesis, UNIVERSITAS TEUKU UMAR MEULABOH.

Y

Y U L I A N I, NIM : 09C10207038 (2016) ANALISIS KUALITAS PELAYANAN TERHADAP KEPUASAN PELANGGAN DENGAN MENGGUNAKAN METODE SERVQUAL DI SPBU PASTI PAS MEUREUBO KABUPATEN ACEH BARAT. Skripsi thesis, Universitas Teuku Umar Meulaboh.

Z

ZULFIKARDI, NIM: 09C10207021 (2016) ANALISIS TINGKAT KEANDALAN KOMPONEN MESIN SCREW PRESS MENGGUNAKAN METODE WEIBULL DI PT. KARYA TANAH SUBUR. Skripsi thesis, UNIVERSITAS TEUKU UMAR MEULABOH.

This list was generated on Fri Jan 21 04:50:13 2022 WIB.