PERENCANAAN JADWAL TENAGA KERJA DENGAN METODE PDM PADA PROYEK PEMBANGUNAN GEDUNG MUSHALLA MTsN MODEL MEULABOH (Kecamatan Johan Pahlawan Kabupaten Aceh Barat)

ZULFITRAH ILHAM, NIM : 13302069 (2013) PERENCANAAN JADWAL TENAGA KERJA DENGAN METODE PDM PADA PROYEK PEMBANGUNAN GEDUNG MUSHALLA MTsN MODEL MEULABOH (Kecamatan Johan Pahlawan Kabupaten Aceh Barat). Skripsi thesis, Universitas Teuku Umar Meulaboh.

[img]
Preview
Text
BAB I_V.pdf

Download (555kB) | Preview
Official URL: http://utu.ac.id/
Item Type: Thesis (Skripsi)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Teuku Hermilan
Date Deposited: 25 Sep 2017 05:26
Last Modified: 25 Sep 2017 05:26
URI: http://repository.utu.ac.id/id/eprint/779

Actions (login required)

View Item View Item