Muliyadi, NIM : 09C10203008 (2016) PENJADWALAN ULANG PROYEK KONSTRUKSI DENGAN PRESEDEN DIAGRAM METHOD (PDM) (Studi Kasus Pembangunan Pembangunan Unit Sarana Belajar TK Pembina Kabupaten Kecamatan Johan Pahlawan Kabupaten Aceh Barat ). Skripsi thesis, Universitas Teuku Umar Meulaboh.
|
Text
BAB I_V.pdf Download (537kB) | Preview |
Official URL: http://utu.ac.id/
Item Type: | Thesis (Skripsi) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Teuku Hermilan |
Date Deposited: | 24 Sep 2017 08:05 |
Last Modified: | 24 Sep 2017 08:05 |
URI: | http://repository.utu.ac.id/id/eprint/708 |
Actions (login required)
![]() |
View Item |